Equipment
& Service Requirements for eclassrooms
Equipment
The
items marked with * are installed by an outside contractor.
*Multimedia Projector
*Ceiling Bracket (for mounting the Projector)
*Wall Box and PanDuit (for cabling from the Projector)
*SmartBoard (if required)
*84” x 84” Pull-Down screen
*Speakers (1 pair)
*Remote Control (either in box or fastened to the table)
Desk & Bookcase (if required)
Computer System
Stereo Amplifier/Tuner
VHS/DVD Unit
VGA Splitter
Cisco Phone (for internal
use only with the speed dial pre-programmed for Classroom Support, Blackboard
Help, Security and ITS Help Desk)
Kensington Lock
Bolt & Padlock
Cables Required:
-
2 - 25 ft. VGA male to male (Laptop &
CPU)
-
2 – 25 ft. Network cables (Laptop &
CPU)
-
2 – 6 ft. stereo mini to twin RCA (audio
for the a Laptop & CPU)
-
2 – 25 ft. RCA male to bare end (audio from
amplifier to speakers)
-
1 – 25 ft. F-type to male RCA (video from
the VHS/DVD)
-
1 – 6 ft. twin RCA male to male (audio from
the VHS/DVD)
-
1 – 6 ft. VGA male to female (connect from
the CPU to VGA splitter)
-
2 – electrical power bars
-
Mouse and keyboard extensions (recommended)
Services
that will be required:
The items above marked with
* are installed by an outside contractor.
Learning & Teaching Services
-
Initial coordination with
the end user
-
Contact and liaison with
installation contractor/technician
-
Follow-up maintenance and
in classroom support by calling 2500
-
Computer imaging.
Physical Resources
Coordination of the electrical requirements:
-
Ceiling electrical outlet for the projector
-
Electrical outlet near the desk for equipment
Purchasing
-
Control of the standing
offer regarding installation company
-
Processing all orders for
equipment
Security
Installation of the security
system contacts and cabling on the installed equipment
ITS
-
Installation of the network drops and security cabling
-
Programming of the Cisco phones
|